Annoyingly, I have lost a whole load of photos. I even had one of a bright glowing object in the sky which I was going to ask you guys about.
I carried on working on the Utility roof. I had to make some little ledges in the corner of the returns either side of the roof (the wall is set back) to take the lead which will form a little back-gutter, preventing water gathering against the return. The difficulty on the "old" side of the roof is that the old building will increase in size by about 120 to 125mm to each wall face, and, furthermore, I couldn't attach anything to the rotten corner post so that I could remove it at a later stage to replace.
You can see what I am talking about here, underneath the elbow in the temporary down-pipe, clad in blue breather-membrane:
I finished the felt and battens both sides. I also offered a few tile samples up to get an idea of what things would look like:
A complete change of scene. I moved to the south gable, and before I could build the end of the infill wall, I had to fix the bracket in place which attached the end of the longitudinal beam to the glulam beams. Well, the former had a twist in it. To take this out, I put one of the 6" coach screws in the top to locate one corner, then nailed a block to the bottom to use as a whacker to untwist the beam. Remember that this is a really chunky item made up of 3 big pieces of 200 x 50 fastened together, so taking out a twist isn't easy. Anyway, a trick is to put a nail in at 45 degrees, and then hammer it home. You can see from the mark how much movement I got:
I bolted that all up, but again, no photos. It wasn't a straightforward exercise, as I had to drill in to the glulams from different directions to meet in the middle, then bang a piece of threaded rod through the combined holes.... Any, no photos, you'll just have to take my word for it.
I then built the little studwork wall, set back from the line of the gable. I could only build it to cill height because the temporary roof was in the way. I also removed the old lime render below a line just above the roofline:
Just to reiterate that this is a slate roof (25 degree pitch), and thus orthodox exposed rafter feet, rather than sprockets (slate has to have a flat line, with no kick):
Three new rafters in place:
I worked out the gauge for the slates, did the eaves carrier as before (again, a photo has gone missing), and started felting. Unfortunately:
Not enough felt. So I did a little infilling job before it went dark, putting in some upstand timbers to support the lead flashing at the junction of roof to wall:
Off to the Builders Merchants to discover that they have run out of membrane, so a quick change of plan for tomorrow is in order. This is a pity, as it might snow on Thursday, and I really don't want to be on the roof again whilst it is snowing, and I don't want the extension filled up with snow if I can help it.